Discuss Your Project
Tell us about your board and your process, and we will review what fixture design fits.
The fastest way to reach us is by email. Describe your process and your PCB, attach a photo or drawing if you have one, and we will reply with the next steps.
Email: Leon@smthelp.com
This opens your email app with the details filled in, addressed to Leon@smthelp.com. Drawings and Gerber files can be attached there.
What to send
Process type, PCB size and thickness, panelisation, a photo of the board, support and keep-out needs, equipment limits, an estimated quantity, and files if available — a PCB drawing, Gerber, CAD or other reference files. A first enquiry does not need everything on this list — start with what you have, and we will tell you what else helps the review.
Frequently Asked Questions
What do you need to quote a fixture?
Process type, PCB size, thickness and panelisation, support and keep-out needs, and the equipment the fixture will run on. Gerber, CAD or drawings help; a sample board works too. Send what you have — we will tell you what else matters.
Can I send a sample board instead of files?
Yes. A sample board is often the fastest route: we measure the board, its panelisation and component heights directly. A photo of the board also helps the first review.
What materials do you use?
Wave and selective fixtures are normally built in high-temperature synthetic stone; printing fixtures and reflow carriers are normally built in aluminium. The exact grade is confirmed against your process during technical review.
How long does a fixture take?
Standard lead time is 3–5 working days. Reference values: design confirmation in 24 hours, and prototyping in 48 hours — both subject to technical confirmation. Rush builds are available at 24–48 hours.
What if the design needs to change after the trial?
We review the trial result with you, agree what needs to change, and adjust the design before production. Changes after production are handled case by case.
How will I receive the quote?
By email, after the engineering review. We can also supply a drawing or confirmation step before production where the project needs it.
Can you sign an NDA?
Yes. An NDA can be signed before you send drawings, Gerber or a sample board.
Southern Machinery — Shenzhen, Guangdong, China
Send your requirements — our engineering review comes first, then design and quotation.